Egyptian Marketing Consultants (EMC)2019West Assuit Power plantInstallation of Hydrogen Unit
Egyptian Marketing Consultants (EMC) / EDEPC2018Abu Sultan Power Plant (4x150)MWMechanical and Electrical construction for Feed Water Pumps Replacement in Unit two
Alexandria National Refinery petrluim Company (ANRPC)2018Steam blow out for the CCREngineering, procurement of material construction of steam blow lines , blow out through silencer with ENPPI
Egyptian Marketing Consultants (EMC)2018Abu Qir Steam Power Plant (4x150MW) - Unit 2Mechanical and Electrical construction for Feed Water Pumps Replacement with all related piping
Egyptian Marketing Consultants (EMC)2017Sidi Krir - combined cycle Power Plant (750MW) Installing, Commissioning and Start Up New Hydrogen Generating Plant with Capacity 15 Nm/h
Egyptian Marketing Consultants (EMC)2017Attaka Power Plant (2x150+2X320)MWErection of Special self-cleaning Filter with Replacement of the related lines
Egyptian Marketing Consultants (EMC)2017Abu Qir Steam Power Plant (1300MW) - Unit 7Mechanical and Electrical construction for 2 KSB Turbine Feed Water Pumps 1,000 Ton each Replacement with all related piping
Egyptian Marketing Consultants (EMC)2016Abu Qir Steam Power Plant (4x150MW) - Unit 4Mechanical and Electrical construction for Feed Water Pumps Replacement with all related piping
GE Power - Gas Power Systems2016Sharm Elshiekh Power Plant (6xLM6000 Gas Turbine) - Unit 4Gearbox Maintenance and Replacement Activities
OFMECO Pressure Components Srl2016Ain Sokhna Super Critical Power Plant (2X650) MWDeaerator Thermal Design Improvement, High Pressure Heater Inspection Unit 1& 2
OFMECO Pressure Components Srl2016Ain Sokhna Super Critical Power Plant (2X650) MWHigh Pressure Heaters Inspection & Repair Unit 1
Egyptian Marketing Consultants (EMC)2015ETHYDCO Ethylene Project - AlexandriaSupplying Insulation Material & SS Spools
Egyptian Marketing Consultants (EMC)2015Assuit El-Waledia Steam Power Plant 2x320MWDetail Engineering, Installing, Commissioning and Start Up New Hydrogen Generating Plant with Capacity 10-15 Nm/h
TBEA Shenyang Transformer Group Co., LTD2015Giza North Power Plant CP-113 Combined Cycle Power Plants 2250MWDesigning, Supplying and Installing Transformer Radiator Support
Hassan Allam Construction201514 Gas Turbine LM6000 at three sites Hurgada , Sharm Elshiekh and port saidInstalling , testing and pre commissioning of Qty. (14) Gas turbine LM6000 complete power block
Kelvion FZE2019District Cooling Plant, New CapitalInstallation and commissioning of cooling towers at ACUD
Egyptian Marketing Consultants (EMC) / EDEPC2015Abu Sultan Power Plant (4x150)MWMechanical and Electrical construction for Feed Water Pumps Replacement in Unit Four.
West Delta Electricity Production Company (WDEPC)2014-2015WDEPC Building in Gelim & Sidi Krir PP Administration BuildingSupply and Install 105 kWp Grid Tie Solar Photovoltaic Roof System
Egyptian Marketing Consultants (EMC) / WDEPC2014-2015Abu Qir Power Plant / Unit Five 300 MWConducting the Dismantling, Supplying, Installation and Pressure Test Activities for High Pressure Heaters no. 6 & 7
Egyptian Marketing Consultants (EMC) / EDEPC2014-2015Auon Mousa Steam Power Plant (2x350)MW / / Unit TwoConducting the Dismantling, Supplying, Installation and Pressure Test Activities for High Pressure Heater no. 6 Coils
El-Nubaria - Mohamed Ragab Farm2014Deep well Pump 9 kWSupply and Install Solar Water Pump System 9.4 kWp.
Egyptian Marketing Consultants (EMC) / EDEPC2014Abu Sultan Power Plant (4x150)MWMechanical and Electrical construction for Feed Water Pumps Replacement in Unit One
Egypt Engineering Services Co. S.A.E. (EGYPTROL)2014EGYPTROL Roof Solar SystemSupplying and Installing 3 kW Solar Photovoltaic Grid Tie Roof System
TTC/TPSC2014Sidi Krir Combined Cycle Power Plant 750MW / CP-118Dismantling, Supplying and Installing Five spools in WS system
ERCC - Kafr El-Sheikh - Abu Riad Village - Omar ElWeshy Farm2014Farm Fish - Surface Pump 2.5 kWSupplying and Installing Solar Water Pump System 3.5 kWp
Egyptian Marketing Consultants (EMC)2013Attaka Power Plant (2x150+2X320)MWErection two (2) Self Cleaning Filters on Closed Cooling Heat Exchangers and Supplying the Mechanical Items
Egyptian Electricity Transmission Company EETC / Upper Egypt Electricity UEE2013Supplying Fire Fighting Equipments to Upper Egypt Electricity - Aswan Networks Sector BuildingsSupplying Fire Fighting Extinguishers and Out Doors Fire Hose Cabinets
Egyptian Electric Utility and Consumer Protection Regulatory Agency (ERA)2013ERA Roof Solar SystemSupplying and Installing 13.72 kWp Grid Tie Solar Photovoltaic Roof System
Abu Zaabal Fertilizers and Chemicals Company (AZFC)2013Unit Seven 15 MW Steam Turbine GeneratorConducting the Operation and Preventive/ Corrective Maintenance
East Delta Electricity Production Company (EDEPC)2013Attaka Power Plant (2x150+2X320)MWSupply and Install Charging Headers for 250 Bar H2 Cylinders in H2 Generation Unit
TBEA Shenyang Transformer Group Co., LTD2013Giza North Power Plant CP-113 & Banah Power Plant CP-113 Combined Cycle Power Plants 1500MWSupplying Mechanical and Electrical items
Suez Steel Factory2012-2013Suez Steel FactorySupplying Electrical and Mechanical items
SEPCO III2012-2013Giza North Power Plant Combined Cycle Power Plant 1500MWSupplying Mechanical and Electrical items
SEPCO III2012-2013Banha Power Plant Combined Cycle Power PlantSupplying Mechanical and Electrical items
YoungJin Electrical & Instrumentation Co., Ltd2012Ain Sokhna Power Plant CP-105 (2X650)MWErection, Commissioning and Start -Up for Instrument and Electrical work in Boiler # 1,2
Egyptian Marketing Consultants (EMC)2012Abu Qir Power Plant (2x650)MWSupplying all Mechanical and Electrical items required for H2 Unit Erection
YoungJin Electrical & Instrumentation Co., Ltd2012Ain Sokhna Power Plant (2X650)MWSupplying mechanical item and Scaffolds tools for Boiler #1,2
Egyptian Marketing Consultants (EMC) / EDEPC2012Abu Sultan Power Plant (4x150)MWMechanical and Electrical construction for Feed Water Pumps Replacement in Unit three
Egyptian Marketing Consultants (EMC) / EDEPC2012Attaka Power Plant (2x150+2X320)MWErection, Commissioning and Start -Up for new Hydrogen plant
TTC/TPSC2012Sidi Krir Combined Cycle Power Plant 750MW / CP-118Supplying Mechanical and Electrical items
Egyptian Marketing Consultants (EMC) / EDEPC2012Auon Mosa Power Plant (4x350)MWSupplying all Mechanical and Electrical items for H2 unit replacing
Egyptian Marketing Consultants (EMC) / EDEPC2012Abu Sultan Power Plant (4x150)MWErection, Commissioning and Start -Up for new Hydrogen plant
Tourah Cement Factory2011Tourah Cement FactoryElectrical work for replacing Packing Plant no. 3
ASIC Automation2011Closed water cycle-Tourah Cement PlantSupplying instruments fitting